-
“The model-based estimating workflow has been a game changer for us. It’s more accurate, which is the big key. I’ve done this for seven years: coordinating in the field or model-based coordination. So when I’m looking at these buildings, I’m drawing it like I would install it. [With SysQue and …
-
"Because we have a level of confidence on exactly where projects are and how they’re going to end up, we were able to pull $70 million out and redeploy it for other needs."
-
“We’ve worked all around the country doing fixed tilts, dual axis trackers. Pile driving on a solar field is the bread and butter of our business. We know, if those piles don’t go in right, the solar array performance will suffer.”
-
“Moving into assembling the construction systems we manufacture off-site was a logical next step in advancing the business, but even though the market demand was there, we couldn’t do it alone.”
-
“Many people aren’t able to read plans or visualize the plan in 3D from a bit of paper. Our ability to effectively bring the project to life right in front of their eyes with Trimble SiteVision has great benefits. We love that we can go out in the field with …
-
"One of the key things I like is the easy workflow and automatic registering in the field for the scans I capture."
-
“All of this high tech stuff we are doing is quite unique. You can get all of this technology if you’re working with the big consulting companies here in Sweden. But the difference is if you are working with them, you need 20 guys. But with SiteVision, we will manage …
-
"eCognition is incredibly teachable. It absorbs various forms of data, it strictly follows rules and it adapts when the information or rules change. It's the ideal student."
-
"We suspected there was a way to automate this and get a little more data using Trimble technology. We reached out to the folks at Cansel who were able to find the ideal solution to Our problem."
-
"Historically, the workflow from the design platform into the contractor’s platform has required a lot of duplicated effort from the contractor, who essentially has to build their own models from paper plan sets and 2D design files. As everyone is moving to digital delivery, the ability to seamlessly transfer usable …
-
“Through this cohesive and collaborative workflow, we were able to make iterative design changes such as moving a noise wall closer on a berm to reduce the wall size by half. Our team can design the iterative changes, quantify them in real-time and work with MnDOT design, construction, and maintenance …
-
“Walking piles to measure volumes with a GPS rover was just too time-consuming for the sheer size of our piles.”
-
“Many aren’t familiar with the technology, which is fine because of how easy and straightforward Trimble Stratus is to use.”
-
“The software we had previously been using was pretty basic – it didn’t allow for effective collaboration and also wasn’t 3D compatible. We would have to manually add in the figures and setting out points for roadways, while also manually typing in coordinates. While it worked fine for its time, …
-
“The overall goal of the road project is to make it socioeconomically profitable. We believe model-based collaboration and open information flow contribute to success. Therefore, we will complete the road project through a full digital planning process, and we have contracted the consultants using the Best Value Procurement method to …