-
“Managing the monitoring in-house has brought us innumerable benefits—including satisfied clients and stakeholders. Should significant movement in the track occur, there is no ambiguity and trains can be stopped immediately."
-
“Keeping current files is a full-time task on a job like this where the design is still evolving. Small changes can be transferred in minutes, while others require a new surface model—but all of it can be done digitally and very quickly with WorksManager.”
-
“We chose Tekla software to manage the whole process from the commencement to delivery of this project so that we could support our client on job planning and project management. Tekla enabled us to maintain our quality throughout the detailing process even though we faced several challenges. The needs of …
-
“The new system allows for much more efficient and transparent backlog management. Our previous ways of working resulted in a loss of 5-10% of already agreed contract work.”
-
"The Trimble X7 scanner allows us to control our working atmosphere for prefabrication while also removing the added variables of a busy construction work area. The scanner also gives us exact information, which greatly diminishes the labor burden. It is efficient, user-friendly and informative."
-
“The biggest reason we were interested in investing in a scanner was that we wanted to be able to scan the mechanical room on a new construction site once the equipment is installed and set, The goal is to bring that information back into the model to see where the …
-
"The construction industry is very hands-on, so we wanted to do the FieldLink and RTS training on actual projects to make the best use of everyone’s time."
-
“With the Trimble, everyone is trained on one system and we’ve gained efficiencies by having one person do the layout instead of two, Superintendents can pick their own points and know what they are associated with, shoot any point they want on the fly, and share the information with the …
-
"Drawing-free delivery of infrastructure projects developed with the BIM and 3D methodologies is nothing new, but this is the first time that a system in which the models will be brought over to the maintenance- and operations phase is being created."
-
“Not only is this project extremely complex, it’s also the first of its kind to repurpose an existing mall this large in North America, We’re a tech-driven firm, so it was clear early on that we would need the most advanced technology to help us overcome the challenges and deliver …
-
"I saw businesses like ours using 3D laser scanning technology to more quickly capture very detailed data points, I knew that we could win more business and expand by putting the same technology in place.”
-
“I hit import and I was blown away because I could see every anchor bolt, nut, column, brace and everything in the entire frame.”
-
"One of the reasons for getting very few errors and mistakes is that all design has been done in 3D, with conflict control for all disciplines. That gives us good control and excellent work progress."
-
“The project manager for one client told us, ‘I’m a skeptic. I’m not crazy about some of these new technologies.’ Then he became a zealot within an hour because we saved him a lot of rework and mistakes that were caught early on.”
-
“Moving into assembling the construction systems we manufacture off-site was a logical next step in advancing the business, but even though the market demand was there, we couldn’t do it alone.”