999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • "While we have experience in all areas of construction, ground beams, and foundation design is a common example of the work that we do at Integra, especially for the housing market."

  • “Conventional staking and grading would have taken at least 30% longer. With steep slopes on the reservoir project, our operators ran the mass excavators and scrapers consistently within a foot or less of grade and we eliminated the surveyor entirely, so it keeps the job flowing smoother. We were then …

  • "The biggest problem in construction is the sheer volume of information. We use SketchUp to consolidate data into a visual story we can share with stakeholders."

  • “I like the accuracy of everything, especially with LiveCount and being able to do takeoff on-screen and having it link directly to the estimate.”

  • “The quantities were not matching up with our stockpiles and we were going through our stock too quickly, so we knew we were putting out too much salt.”

  • “We use the Trimble Marine Construction system to track the bucket location in real-time in 3D—a huge advantage in water Essentially, the 3D map created by Trimble is the only eyes for the excavator operators to know where they’ve been and where they need to go. Project managers are also …

  • “We’ve been extremely successful with 3D leveling techniques to create new profiles for almost a decade, The 3D version with the total station has proven itself in the most diverse tasks. That's why we were sure that the project in Berlin-Mitte would also be successfully completed in this way."

  • “Prefabrication allows us to provide a better end product to the client because we can pre-assemble our materials in a controlled environment with a much wider array of tools and technologies.”

  • "As jobs have grown in scope, scale and complexity, and timelines have gotten tighter, we have had to expand our capabilities and workflows to ensure productivity and efficiency, especially in the way of project estimating, construction site positioning, stakeout, measurement and machine control.”

  • “Machine control is the future, and we want to be at the right side of the future, For MJ Church this means that we start every project with the intent of putting machine control in, as we know that it will lead to the greatest efficiency possible.”

  • “LiveCount is invaluable to our estimating and project management team, helping us track and tell the story of a project’s progress from design through construction.”

  • “For us the decision to move to Accubid Enterprise was the correct one. Our confidence in our estimates is greater than it’s ever been and our team is more productive, allowing us to bid more work.”

  • “A couple years ago, our executives decided to re-assess all the advancements in technology, particularly aerial photography, 3D and machine control to drive efficiency and quality outcomes, despite industry challenges.”

  • “We developed an approach that puts our operators in a remote operations control center, safe shelters located about 1 km from the sites. Within these shelters, the operators drive the excavation and loading of materials just like they would normally, except in front of monitors.”

  • “Stabicad is used for our Project Design from the design concept up to the construction/manufacturing - taking the Revit model and developing with its tools and ease of use, before handing over to our process-specific solutions for the next stages.”