895 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “We are always looking for ways to effectively leverage our spatial assets to increase operational efficiency, reduce expenditures and derive value from improved workflows. For viticulture and infrastructure projects, the Trimble Catalyst DA2 GNSS receiver is a game changer.”

  • “Using the MX7 is so straightforward that, after a couple times setting it up, using it becomes second nature.”

  • "With Fleet Management, our dispatchers can see which vehicle is closest to the job and know where to send them. Our technicians work all around Puerto Rico, maintaining 500 towers. It is a small country but we drive a lot. Ricardo Ramos, Operations Manager of Atlantic Tower Servi."

  • “The quantities were not matching up with our stockpiles and we were going through our stock too quickly, so we knew we were putting out too much salt.”

  • “We use the Trimble Marine Construction system to track the bucket location in real-time in 3D—a huge advantage in water Essentially, the 3D map created by Trimble is the only eyes for the excavator operators to know where they’ve been and where they need to go. Project managers are also able to track progress and material quantities moved.”

  • “We’ve been extremely successful with 3D leveling techniques to create new profiles for almost a decade, The 3D version with the total station has proven itself in the most diverse tasks. That's why we were sure that the project in Berlin-Mitte would also be successfully completed in this way."

  • “Prefabrication allows us to provide a better end product to the client because we can pre-assemble our materials in a controlled environment with a much wider array of tools and technologies.”

  • "As jobs have grown in scope, scale and complexity, and timelines have gotten tighter, we have had to expand our capabilities and workflows to ensure productivity and efficiency, especially in the way of project estimating, construction site positioning, stakeout, measurement and machine control.”

  • “Machine control is the future, and we want to be at the right side of the future, For MJ Church this means that we start every project with the intent of putting machine control in, as we know that it will lead to the greatest efficiency possible.”

  • “LiveCount is invaluable to our estimating and project management team, helping us track and tell the story of a project’s progress from design through construction.”

  • “For us the decision to move to Accubid Enterprise was the correct one. Our confidence in our estimates is greater than it’s ever been and our team is more productive, allowing us to bid more work.”

  • “A couple years ago, our executives decided to re-assess all the advancements in technology, particularly aerial photography, 3D and machine control to drive efficiency and quality outcomes, despite industry challenges.”

  • “We developed an approach that puts our operators in a remote operations control center, safe shelters located about 1 km from the sites. Within these shelters, the operators drive the excavation and loading of materials just like they would normally, except in front of monitors.”

  • “Stabicad is used for our Project Design from the design concept up to the construction/manufacturing - taking the Revit model and developing with its tools and ease of use, before handing over to our process-specific solutions for the next stages.”

  • “Estimation MEP is perfect for us as we don’t need to install anything to get started. I can safely and securely store my drawings in the cloud and not have to worry. We can easily perform take-off, search for content and churn out accurate estimates quickly!”