“Investments are being made into building weatherproof electric network by efficient optimization. This applies to all parts of the network."
-
"Innovation has to be continuous at IEA, and the procurement and deployment of these machines have certainly innovated our solar work."
-
"Making cost calculations, long-term plans and regional rehabilitation plans require having all the data in the same system. Trimble NIS has served us well."
-
“I got push back for about a week. But when they realized that our productivity jumped from 2,100 yards of grading and compaction a day to over 6,000 a day, with great accuracy, they were sold.”
-
“The sitework alone required the movement of more than 3,000,000 cubic yards of dirt, considerable storm drainage systems, and several very deep foundations.”
-
“Especially in the early days, things were changing on the fly around the site. The engineer might reroute a ditch that is already in work.”
-
“Keeping current files is a full-time task on a job like this where the design is still evolving. Small changes can be transferred in minutes, while others require a new surface model—but all of it can be done digitally and very quickly with WorksManager.”
-
“Speed to market is everything. We estimate a 15-30% labor savings on any job using Trimble SysQue with Trimble Connect and Trimble Robotic Total Stations.”
-
"With SysQue, the content that’s in there is managed in Revit; it’s very easy to go edit the family or if it’s not there, pull the family from the [Trimble MEPcontent] website. As opposed to [Autodesk] Fabrication, we would have had to manage and edit the content in Fabrication and …
-
“Having clean and organized data is central to our business success so we knew we needed to overhaul our system so that our customers could subsequently become more efficient and profitable themselves.”
-
“There are many day-to-day challenges on these sites, as they are typically very large, in some cases upwards of 6km long. And we’re working within an operational light rail environment, so trains are flying by at 100km an hour. In the early days, a lot of the communication was happening …
-
“We were able to fly the drone over the site, which took about 10 minutes, upload the data to Trimble Stratus and have it ready for review and analysis the next day.”
-
“Nearly every type of our technology-enabled equipment—from GNSS rovers to machine-controlled graders to drone mapping systems—was used on this site development.”
-
“Having the right tools, like Accubid Anywhere, in our peoples’ hands helps us keep pace and continue to serve our customers.”
-
“My focus is on the user experience, and many in-house functions are now moving to the cloud. When the software is hosted on premise, it requires a dedicated VPN connection for remote access. With Accubid Anywhere, users can log on from virtually any type of connection and instantly access the …