999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • "Stabicad's changed the whole workflow of the company and it's sped the [MEP design] process up 3 times."

  • “Even with fuel prices at an unusually low level, we’re seeing significant savings per gallon—savings that will be even more important when the market pricing goes back up.”

  • “I am really happy with the accuracy and how easy it is to use."

  • “Thanks to our collaboration with Trimble, we are able to pilot on site the latest devices and software applications that help plan and carry out construction.”

  • "Throughout the project, our partners have had access to the IFC model via Trimble Connect, which among other things has enabled detailed logistics planning. Transportation and assembly have been optimized by determining how many tons per transport and how much can be assembled per week. This has eliminated unnecessary preloading …

  • "To still keep the schedule, we worked in stages. We built on previous project experiences and applied them to this project."

  • “The project team consisted of the owner, contractor, lead design firm, suspension bridge specialist, geotechnical engineer, environmental loading expert, steel fabricator, and steel detailer. Design-build meetings were hosted with Tekla Structures for all the project team members to visualize the unique structure and it was a very important tool in …

  • “This was a large-scale and complex project. Construction took place as the airport was still in use, so we had to ensure the functionality and safety of the site at all times. The architecture is also very demanding, with many interfaces to the old terminal and various deck structures.”

  • "We went from being a 3,000 tons per-year factory to about 12,000 tons per month. This was a big shift, and the key to achieving it was our ability to use Tekla Structures software. We can now handle 30 to 40 projects in our shop."

  • "About 500% of the time used for planning has been reduced."

  • “We chose Tekla software to manage the whole process from the commencement to delivery of this project so that we could support our client on job planning and project management. Tekla enabled us to maintain our quality throughout the detailing process even though we faced several challenges. The needs of …

  • “One of the key factors while considering my responsibilities as a ‘AGM Engineering’ is to boost my team’s overall productivity and ensure the quickest project delivery. And in this, Tekla Structures has been an amazing tool for achieving our goals. While comparing to other software tools that would need hours …

  • "We all know construction is a massively challenging industry and there are so many different approaches and methods that can be chosen. For me, we need to find little pockets of things we can change to enable true collaboration."

  • "It is also valuable when you consider that modular construction can involve a lot of repeated connections and details. This theme of standardisation not only helps from a detailing and fabrication point of view but also in the factory too. Teams will often be welding or installing repeated connections, making …

  • “When the drawings for reinforced concrete construction are created in 2D, the chances of missing certain sections of rebar increase. This can cause huge time delays and additional costs for making the fixes. 3D modeling, such as that provided within Tekla Structures, allows for the proposed drawings to be checked …