“We heard from the project owner that other contractors on the Moapa solar site were struggling to drive piles because of the severe, rocky terrain."
-
“Safety and risk management is on everybody’s mind these days with CSA (Compliance Safety Accountability), and PeopleNet is a great asset in this area.”
-
“The two tools, AutoBid Mechanical and AutoBid SheetMetal have already paid for themselves. As we grow, I believe we’ll rely on these tools even more as a way to continue to provide quality solutions to our customers with greater efficiency.”
-
"We’re saving £750 to £1,000 per day– so over a 51 week construction period this really adds up to a significant savings."
-
“Given the nature of construction projects, we knew we needed a system developed specifically for this industry. I had used Viewpoint For Projects in a previous role, so I was well aware of its capabilities. What’s more, the business was already using Viewpoint Field View for tracking quality and works …
-
"We use Tekla Structures because it is a parametric modeling tool and the model includes all of the data that is relevant to the project, from conceptual design to detailing and fabrication."
-
“I am proud to say we are now the second largest precast concrete producer for residential housing in the country, with the ability to cast for ten houses per day.”
-
“We were small, and everything was done by hand. I would lay prints out in my living room, marking them up with a ruler. It was slow and tedious. That’s when I realized there had to be a better way.”
-
”The challenge of the Kirri-Tikkakoski project is its enormous scope. It is one of Finland’s largest single infrastructure contracts, which will be constructed as a single project.”
-
“At Mason Navarro Pledge, we’ve been using Tekla Structural Designer for many years. While the software is perhaps predominantly known for its steel capabilities and the interface with Tekla Structures, it is just as valuable for concrete design."
-
“Another crucial factor for us to consider during the design phase was fatigue. The waste bunker building features two overhead gantry cranes, which run along crane beams supported by main columns. Considering the cranes’ 24-hour operation, all connections associated with the crane had to be meticulously designed and detailed to …
-
“Using Tekla Structures and automation tools with Tekla Open APIs, our engineering team helped the general contracting company save 40% time and reduce costs by 15%. We strategized the correct usage of Tekla Open APIs, functions and parametric custom tools to eliminate errors and allow our client to track changes, …
-
“On a project of this size, effective collaboration is both the biggest challenge and the most valuable asset. Despite the scale of the structure, the construction has kept to schedule – an achievement that I think must be attributed at least partially to the integrated coordination between stakeholders, facilitated by …
-
“This project was different right from the outset, not just in terms of its charitable nature but also the structure’s volume, its striking shape and the incredibly collaborative environment curated amongst stakeholders."
-
“We had originally been using a basic, older-generation package that wasn’t particularly user friendly. As such, we then switched to the same MEP software as our electrical design software; however, this didn’t integrate efficiently with Revit and was missing some of the key features relevant to our work. We looked …