895 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “Just as technology can help to detect cancer and provide treatment that we did not think was possible, governments can use technology to triage the homes and neighborhoods that could benefit from immediate upgrading interventions."

  • "Even after nearly two decades, TMW.Suite continues to evolve and influence our outcomes every day. In the last year we’ve experienced a 20% increase in revenue, a 15% increase in our asset pool and a 0% increase in overhead. The entire circle of service is constructed to Tandet’s own specifications, helping to ensure predictable, repeatable results on every dispatch."

  • “The results were eye-opening. In terms of productivity, the manual team was able to mark 156 points in about 48 hours. The Trimble FieldLink team of three marked 210 points in four hours."

  • “Our goal is to have one resource for all site data—about labor, equipment and materials—on a project that is continually updated. We've been back and forth with other organizations trying to find this real-time, as-built connected data workflow. Trimble stood out as the one that has the most and best products—as well as the willingness to work with us to optimize a solution.”

  • “By centralizing all of our data in one place using the Trimble Construction Cloud and Microsoft Power Apps, we have the framework to sort through all project data in one place, allowing us to come back with actionable conclusions.”

  • "Before a project starts, we are juggling subcontractor availability, project start dates, site logistics and ensuring the availability of skilled craftsmen, As projects progress, we ensure trades are working together, moving in the same direction and elevating issues that need resolution. Up-to-date information is essential to keeping projects moving and making critical decisions, both impacting profitability."

  • "Any team member can enter data once, and it populates in both ProjectSight and Viewpoint Vista, It eliminates the need to enter information in multiple systems and gives us the peace of mind that everyone, from the office to the field, is working from the most current, up-to-date information."

  • "We have been able to eliminate a step in our process, Every document, from drawings and revisions, to RFIs and submittals, lives in ProjectSight. Having it all in one platform has made communication more seamless and eliminates unnecessary work."

  • "ProjectSight is a powerful resource. I rarely have to any other software for the information I need to do my job. It has changed how we communicate with teams in the office by ensuring we are all working from the most current versions of drawings and contracts."

  • "When we tag or link RFIs and submittals in drawings, it eliminates excuses or the possibility that someone missed an important issue, The link lets them know an RFI needs addressing."

  • "We use Tekla Structures for concrete, metalwork, facade and methods; and SketchUp for architecture. More recently, we use Trimble Connect for site and model coordination."

  • "Becoming a data driven company in construction right now is really important. In order to do that well, we are embracing the toolset Trimble Viewpoint has to offer."

  • “One of the goals was to use technologies that have an opportunity to improve efficiency and costs for the job."

  • “With the transparency feature, we were actually able to see what was supposed to be there [and] what was not supposed to be there."

  • “You're basically working in both worlds, in the office, and in the field, can see everything the team is working on, which makes it easier to get the work done.”