999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “We chose a new type of solution. A traditional model was never on the drawing board as there was a need to use a specific hybrid of heating and cooling. For the first time in Fortum’s history, the new solution uses an industrial-scale air-water heat pump- and water circulation-based system …

  • “Without the GCS900 system we would have had to put people in the water to take measurements and monitor where we were digging, Instead we were able to keep everyone safely away from the excavation because operators could watch the screen and excavate efficiently and directly in accordance with the …

  • "SketchUp is integral to fueling my creativity. I can generate conceptual work rapidly and get immediate input on my design to progress the work forward."

  • “Trimble instruments are really robust and can stand up to the challenges presented by the elements, like dust and water, And, there is a short learning curve with Trimble Access making it simple for anyone on the team to access the data and analysis they need, when they need it.”

  • “We are always looking for ways to effectively leverage our spatial assets to increase operational efficiency, reduce expenditures and derive value from improved workflows. For viticulture and infrastructure projects, the Trimble Catalyst DA2 GNSS receiver is a game changer.”

  • “We handle a lot of different types of projects from major capital improvement to remodels. Every one of these projects must go through an extensive approval process before getting to construction.”

  • “We made sure the boat’s roof bars were strong enough to hold the roof rack (18 kg) and mapping sensor (23 kg), And we adjusted the bracket position to orientate the roof rack horizontally as much as possible. That’s all there was to it.”

  • “We needed a system that works where, when, and how we want across all stages of a typical project."

  • “Using Catalyst, my phone, and a rover rod, I could go around and record the inner and outer circumference, which gave us a very good indication of the shape and size of the hut, Without Catalyst, we wouldn’t have had the accuracy needed to do this.”

  • “As a data visualization and decision-making support tool, H-Chart helps maximize pavement asset value by improving project planning.”

  • “We developed the MMS training program to make the best use of AgileAssets technology to maintain safe, costeffective road networks. It’s working: We have improved our performance, team morale, and our standing in the industry.”

  • “The 4-Year Pavement Management Plan allows Texas highway districts to get the most value from available project resources by optimally allocating taxpayer dollars. Engineers and administrators can also use the plan as a reporting tool to improve visibility and accountability when briefing elected officials.”

  • “While Trimble e-Builder’s sweet spot is construction, it’s really built to manage the lifecycle of an owner’s construction project."

  • “It was a simple process and the training was straightforward. No other improvements to our existing infrastructure were required."

  • “There was no doubt that technology was the answer to our problems, but we were unclear as to exactly which solutions it would take to turn things around."