999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “I got push back for about a week. But when they realized that our productivity jumped from 2,100 yards of grading and compaction a day to over 6,000 a day, with great accuracy, they were sold.”

  • “We were able to achieve an average standard deviation of 4 millimeters across the entire 92,000 square meters on the surface lift. We were very satisfied with this performance over such a large area.”

  • "Even just having a 3D model at the estimation stage is a huge help, compared to working solely in 2D. As well as giving you greater insight into the project and the “end goal”, it also helps to give you a real ‘feel’ for the job and a better understanding …

  • “The Trimble monitoring team implemented a system that met our needs for making safety and maintenance decisions for the Pretty Rocks Landslide project, Before implementing the automated monitoring system, we had a poor understanding of what meteorological conditions were the primary drivers of increasing displacement. Heavy rain is often a …

  • “Our main activity is the acquisition of high-performance geospatial data in dynamic and static 3D scanning as well as the sharing of this data with innovative tools."

  • “I love that I have the ability to troubleshoot the system live, If there is a concern on a section of track, I can immediately look at the system, take additional measurements, push a button and receive a report with all the data so I can immediately distribute it to …

  • “Sending in the scanner for calibration can be costly. But it is the downtime that really becomes problematic.”

  • “Just as technology can help to detect cancer and provide treatment that we did not think was possible, governments can use technology to triage the homes and neighborhoods that could benefit from immediate upgrading interventions."

  • “It was very apparent from the street view imagery that this building was a soft-story. Looking at street view imagery and talking to engineers, it was clear it was a seismically vulnerable structure."

  • “The S9 and T4D Lite have enabled us to deliver exactly what the structural engineers require, all within their specified 24 hour period.”

  • “We proved that incredibly precise photogrammetry-based maps can be produced for the difficult alpine environment. Our results have raised the profile of our multi-sensor fusion technique and given us the confidence to pursue similarly challenging projects.”

  • “Our goal was to completely connect each facet of the work from survey to design to the milling machines."

  • “We strongly believe that sustainability should be an important aspect in road construction. Our goal is always a better quality surface built with less pollution and optimized materials.”

  • “Before we brought on e-Builder we had 3-5 PM’s in the field. e-Builder Enterprise provided the data and resources to make us realize we needed more resources, so we added to the team.”

  • “Trimble instruments are really robust and can stand up to the challenges presented by the elements, like dust and water, And, there is a short learning curve with Trimble Access making it simple for anyone on the team to access the data and analysis they need, when they need it.”