"Based on our current workflow, we’ve seen an improvement in the processing time."
-
“We built a very robust integration that captures budget and the procurement cycle. The books between the Finance department and the books in e-Builder Enterprise are in sync."
-
"Instead of just collecting information, we can actually use it to identify trends and improve our performance."
-
“Communications were terrible, and the Corps had evacuated to Vicksburg, Mississippi. When we finally got through to them, they sent us to the 17th Street Canal to run sections with single-beam hydrographic equipment. The whole city was underwater, so we got around by boat. There weren’t many known points available, …
-
"One of our VDC team goals is to maximize collaboration to come up with the best solution. We never want anybody to say, 'Okay, I'm going to go back to my desk and come back in a week with answers.' We want to do it now, together. With Quantm while …
-
"Quantm is a perfect application for what we do. We see it as giving us a competitive advantage because we have the flexibility and ability to identify more viable routes and we can provide far greater detail about each alignment in terms of quantities and cost estimates of each and …
-
"Thanks to Trimble’s RTK technology, we are within a centimeter at all our job sites and on all of our equipped machinery."
-
“We’ve been using GNSS equipment for a while—the Central Valley is wide open without much canopy—and this time we had access to CSVSN as well."
-
"Needless to say, maximizing earthworks done in October, November and December was a necessity on this project. We regularly use Trimble machine control and site position systems supplied by KOREC so we knew a project like this would be much more lengthy, costly, and virtually impossible, with traditional grading and …
-
"The Quantm system not only provides technical and scientific basis for the route alignment selection/ optimization, reduced alignment cost and planning time, but it also provides a powerful and efficient tool for alignment review, assessment and presentation during the planning and design process."
-
"In the midst of my research, I was realizing that fuel savings and labor savings alone could offer a pretty quick return on investment over a two or three year period. In our experience with the Trimble systems, my initial conclusions are holding true."
-
“During the scheme planning phase the design of the alignment had to avoid going directly through the town of Levin. The brief was also to present corridor options that respected environmentally sensitive, culturally protected land, as well as flood-prone areas.”
-
"In fact, the Trimble site positioning and machine control systems we used helped us to meet our project deadlines."
-
"Our machines have been equipped with a guidance system since 1996 and we have used 3D guidance systems since 2002. The results are so good that we have continued investing regularly in new technologies."
-
"That removes any assumptions or misinterpretations in the field regarding the accuracy and quality of the survey data, allowing them to construct more quickly and confidently from day one.”