999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • "The automation provided by e-Builder and the process changes we’ve implemented are going to go a long way towards ensuring an on-time delivery of this project."

  • "I am unbelievably impressed with all the folks I have dealt with (at Trimble). Their focus on doing the right thing for the customer is nothing short of amazing."

  • "TMT Service Center is enabling us to achieve cost savings for our customers of 5% to 30% because it is a key element in our ability to establish, track and report on key performance indicators. The software is a foundation of everything we do. It’s an integral, fundamental part of …

  • "After we won the bid, we started to look closely at cost-saving ways and how we could do things more productively. We had a 20-month schedule given to us, so we needed to figure out how to get it all done in that timeframe."

  • "We experienced very little rework on this project and were able to avoid potential cost over runs with a great deal of credit being given to our GPS site coordinator Ryan Lepke and the use of Trimble GPS equipment."

  • "Having a fleet of rental equipment with machine control technology allows us to be more competitive and deliver a better product for our customers."

  • "Recently we added an excavator with 3D guidance to the fleet. Since we received it a month ago, the excavator has not come back to our facility a single time and the same goes for our bulldozer, also equipped with the same 3D guiding system. Both machines are fully utilized."

  • “My goal is to connect decision makers with accurate information. I see Trimble SiteVision as a way of providing information that any user can understand.”

  • “We are currently satisfied with the first results. To date, we have saved 25 percent of the time on an intervention; I believe the next evolution of the solution might enable us to save 50 percent of the time or more."

  • "We needed to be ± a quarter-inch after dragging the subgrade on the building pad. With this rocky ground, that’s not easy to do. With the new GCS600 system we were right on target."

  • "Leveraging laser scanning in our daily work had clear advantages. We continue to work closely with Nick DiBitetto and Ryan Fisher at BuildingPoint Midwest to stay current with all the latest technology."

  • "It would have been extremely difficult to field-build the stairs due to the complex curve of the tube steel stringers. By building a complete model with 3D scanned data in RealWorks and Revit, Precision was able to fabricate the stair in a controlled shop environment, which led to a higher …

  • "Compared to the conventional method of laying material, working with a 3D system is much faster. From the beginning, we have gained extra time through eliminating the need for manual and time-consuming string-line assembly."

  • “Communications were terrible, and the Corps had evacuated to Vicksburg, Mississippi. When we finally got through to them, they sent us to the 17th Street Canal to run sections with single-beam hydrographic equipment. The whole city was underwater, so we got around by boat. There weren’t many known points available, …

  • "One of our VDC team goals is to maximize collaboration to come up with the best solution. We never want anybody to say, 'Okay, I'm going to go back to my desk and come back in a week with answers.' We want to do it now, together. With Quantm while …