  • “We had two surveyors on site during peak construction, but usually have just one—and that’s largely thanks to the use of GNSS-enabled equipment.”

  • "Of all the vendors we considered, Fleet Management had the best features, including maps, Landmarks and GPS location data."

  • "ProDesign and the Trimble Electrical Designer package provides us with a highly credible and widely recognised way of presenting our electrical designs and calculations. It gives customers and others involved in the project confidence in the design."

  • "The GCSFlex system is easy to use and intuitive. For example, I can change over from a standard bucket to a tilt bucket just by pressing a button. The system loads the bucket's parameters and I can start work right away. I can also work by myself, which was not …

  • "After we won the bid, we started to look closely at cost-saving ways and how we could do things more productively. We had a 20-month schedule given to us, so we needed to figure out how to get it all done in that timeframe."

  • "We experienced very little rework on this project and were able to avoid potential cost over runs with a great deal of credit being given to our GPS site coordinator Ryan Lepke and the use of Trimble GPS equipment."

  • "Having a fleet of rental equipment with machine control technology allows us to be more competitive and deliver a better product for our customers."

  • "Recently we added an excavator with 3D guidance to the fleet. Since we received it a month ago, the excavator has not come back to our facility a single time and the same goes for our bulldozer, also equipped with the same 3D guiding system. Both machines are fully utilized."

  • “My goal is to connect decision makers with accurate information. I see Trimble SiteVision as a way of providing information that any user can understand.”

  • “We are currently satisfied with the first results. To date, we have saved 25 percent of the time on an intervention; I believe the next evolution of the solution might enable us to save 50 percent of the time or more."

  • "We needed to be ± a quarter-inch after dragging the subgrade on the building pad. With this rocky ground, that’s not easy to do. With the new GCS600 system we were right on target."

  • "Leveraging laser scanning in our daily work had clear advantages. We continue to work closely with Nick DiBitetto and Ryan Fisher at BuildingPoint Midwest to stay current with all the latest technology."

  • "It would have been extremely difficult to field-build the stairs due to the complex curve of the tube steel stringers. By building a complete model with 3D scanned data in RealWorks and Revit, Precision was able to fabricate the stair in a controlled shop environment, which led to a higher …

  • "Compared to the conventional method of laying material, working with a 3D system is much faster. From the beginning, we have gained extra time through eliminating the need for manual and time-consuming string-line assembly."

  • “Communications were terrible, and the Corps had evacuated to Vicksburg, Mississippi. When we finally got through to them, they sent us to the 17th Street Canal to run sections with single-beam hydrographic equipment. The whole city was underwater, so we got around by boat. There weren’t many known points available, …