59 LeanTaaS Case Studies

Industry
Company Size
15 per page
  • 15
Reset
  • OhioHealth Increased Case Length Accuracy by 20%

  • Sidney Kimmel Comprehensive Cancer Center at Johns Hopkins Medicine Increased Daily Infusion Center Volumes by 42%

  • A Leading Indianapolis Health System Generated $1M in Savings/Year by Reducing Patient Moves and Improving Staff Allocation

  • Penn Medicine Increased Infusion Patient Volumes by 25%

  • Nebraska Medicine Grew Volume and Kept Infusion Center Wait Times Under 10 Minutes

  • NewYork-Presbyterian Reduced Average Wait Times by 40%

  • The University of Kansas Health System Increased Volume by 8% Despite a 7% Decrease in Available Capacity

  • Texas Healthcare System Sees 28% Relative Increase in Prime Time Utilization

  • MultiCare Reclaimed 20+ Blocks per Quarter and Millions of Dollars in Block Time

  • SUNY Upstate Medical University Increased Weekly OR Case Volume by 3.4%

  • Health First Eliminated 517 Avoidable Days/Month and Reduced Core Floating Staff Across the System by 44%

  • A Leading Florida Health System Reduced Average LOS by 13 Hours

  • UCSF Reduced Infusion Wait Times at Peak Hours by 31%

  • UMC El Paso Increased Case Minutes by 19% per OR

  • Cone Health Streamlines Surgical Coordination and Boosts Efficiency