InfraBuild Testimonials

  • “Using Prefab Columns cut installation time by 60 per cent and reduced labour needs from 12 to 4 men. The quality is excellent and the service we receive is superb.”

  • “Early in the concept and design of the project it became evident that a steel framed structure could not only deliver architectural interest but would be cheaper and faster to construct than pre-stressed in-situ concrete. Steel could also accommodate design changes during construction. The column free spaces and floor to …