24 Wonderware Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • "The Wonderware solution is working great. To my knowledge there are no other utilities in the world that have the ability to start 40 megawatts of paralleled power generation located at numerous customer sites with a single mouse click."

  • “Before we got up and running with Wonderware System Platform and the Wonderware Historian, it would take days to add a new piece of equipment to the control system,”

  • “The centralization of operations that we get with Wonderware helps manage around 1,500,000 signals and is essential for a critical infrastructure like this. We can now quickly respond to incidents and also be proactive in optimizing management.”

  • "The Plant of the Year award means that we have produced perfect quality product for that entire year. It’s a tremendous priviledge for our people to get this award."

  • "At our Rojana factory, F&N Dairies produces 3 million cans a day of sterilized milk, or 2,500 cans per minute. With the integration of Wonderware software solutions to provide vital data on production processes as well as track and trace, we are able to have comprehensive control of our manufacturing operations to ensure product quality and control."

  • "The largest benefit of the equipment monitoring system is that we are logging automatically now rather than manually, so it’s saving us about 1,100 man hours per year."

  • “The major advantage we’ve experienced is that it’s very easy to develop and integrate the Wonderware software with the wide variety of equipment we have here. Plus their support is global and very timely.”

  • "The Wonderware solution is a lifesaver. I can’t see not having it."

  • "With Wonderware MES Performance Software coupled with New Belgium’s continuous improvement strategy, we have extended our packaging area capacity to about 1.3 million barrels each year. At this point, our approach to higher volumes is ‘bring it on'."

  • "The best part about the SmartGlance alerts, is that we get to the problem before it becomes a problem, and the residents of Seminole county never see a problem."

  • “After all, if a process requires 500kWh there is not a lot that can be done about it apart from shaving off say 5% energy usage, but if the process is shifted to non-peak hours, costs can be reduced significantly. This just goes to show that energy cost need not be dependent on energy usage.”

  • "I would recommend Wonderware to anybody who is looking for a way to improve their process, speed up programming changes and increase profits."