Vecoplan Testimonials

  • “The highest priority in this project was to ensure that the specific requirements were met and that the system had a very high level of availability with low power consumption.”

  • "For us, the protection of the environment as well as the reduction of CO₂ emissions are not just empty phrases but determining factors. Due to Vecoplans conveying system the entire transport route of bark and chips could be relocated in lofty heights above the buildings and streets of Södra – and had been executed to our complete satisfaction."

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked