"Working in 3D transforms the process of collaboration with the wider project team. It helps us bridge the gap, communicate our construction strategy, and collaborate in a format that’s familiar to all stakeholders."
-
“The Trimble monitoring team implemented a system that met our needs for making safety and maintenance decisions for the Pretty Rocks Landslide project, Before implementing the automated monitoring system, we had a poor understanding of what meteorological conditions were the primary drivers of increasing displacement. Heavy rain is often a …
-
“The customer thought it would take two weeks to cut these rods. We did it in two days, That success is entirely enabled by our close working relationship with the team at Trimble, SITECH Northeast and Milton Cat.”
-
“The BIM interoperability and integration that Tekla Structural Designer offers is increasingly crucial as most of our clients have requested for BIM implementation in their projects, especially when it has been proven to minimize the time of construction and improve interdisciplinary coordination and communication. Compared to other software, Tekla Structural …
-
"We must highlight the 20% increase in productivity achieved using Tekla Structures Open API™ and the ability to customize reports and templates. We benefited greatly from all the time we saved and from the easiness of adapting Tekla models to the constant changes in a project of this magnitude.”
-
“The support from Trimble has been excellent throughout and, from our perspective, is one of the big advantages of choosing Stabicad. The team fully supported us through the setup and onboarding process and has been on hand every step of the way as we have used more and more of …
-
“On the electrical side, features such as the autorouting of cables in the 3D model has simplified what is often a time-consuming task. This has been used extensively on a recent project and it saved us all a lot of time and effort.”
-
“The biggest challenge was related to the placement and construction of the 200 or so pillars supporting the deck. The shape of the arena was unusual, so the massive loads on the pillars needed to be simulated multiple times."
-
"Wareing has been around since 1909. We've predominantly remained in business because we are innovators, we’ve moved with the times. The biggest impact that we've seen since implementing Tekla PowerFab is data. We've never ever had data before. We've never had sales information before - what made profit, what didn't, …
-
"Before, we just took paper drawings down and left the team on site to build it. Now, there is a workflow you can follow through Tekla PowerFab. It helps us track where we’re up to, whether steel has been cut, whether it's been fabricated, how much has been fabricated, and, …
-
"We started using Trimble Connect a few years ago. It allowed us to always work with the latest drawings and 3D images on site, which was a big step forward."
-
"We had to produce a number of drawings for the network-rail approval process. Although these needed to be done at an earlier stage than we would typically do on projects, they allowed the client to fast-track the approvals process prior to the main contractor starting on site. Using Tekla to …
-
“Much of what we have done here is ground-breaking.”
-
"Hinkley Point C is one of the largest and most complex projects currently under construction in Europe, as we are building two identical nuclear reactors at the same time. To give you an idea of the scale: We have around 5,000 employees and 50 cranes working on the site at …
-
"Right from the start of the project, we knew we would need a digital system for all our records. Initially, the focus was on how we could capture and manage these records in a digital format so that they were really easy to access, easy to review and easy for …