  • “The museum is a complicated structure and the steel members had different geometries."

  • "I can get real-time information on materials used and where it’s going as it happens, in office. If changes have to be made, I don’t have to hop in the truck to get to the site. I’m in constant wireless communication with our people and machines."

  • “The software we had previously been using was pretty basic – it didn’t allow for effective collaboration and also wasn’t 3D compatible. We would have to manually add in the figures and setting out points for roadways, while also manually typing in coordinates. While it worked fine for its time, …

  • “From kicking the project off with the Professional Services team to training and roll out, e-Builder has been a true partner, and having the ability to custom develop processes around our organization ’as needed’ is invaluable.”

  • “The auditors strongly recommended that we invest in an enterprise-wide software to better manage all of our documentation.”

  • “We have come a long way in a short time – and we are getting results.”

  • "At the company level, we started with a day-to-day approach of what processes and functions needed to be put in place. We started at the grass-roots level – first with field work – and had strong management support throughout the project."

  • "This is an attempt to anticipate the Energy Transition. Valuable information was obtained and the situation will continue to be examined. We are very satisfied and we will certainly make changes to the network's switching states on the basis of this experiment. We care about money."

  • "For 10 kV, both interruption costs and annual outage time were reduced. Most importantly, the peak dissipation power was reduced by more than 100 kW. And the voltage drop was improved with this new optimized switching state."

  • “We’re a project management office that executes conceptual design, engineering, and detailed design through construction and commissioning – and it’s something that we do very well. However, this multi-billion-dollar capital program, which includes funding from provincial and federal sources, added a whole new dimension to our operations and a need."

  • “We recognized that we needed to consolidate our operations, and improve communication amongst ourselves, to senior leadership, and to outside partners and stakeholders.”

  • “We hope to be able to add new quality processes with e-Builder and strive for excellence in our future endeavors.”

  • “We chose a new type of solution. A traditional model was never on the drawing board as there was a need to use a specific hybrid of heating and cooling. For the first time in Fortum’s history, the new solution uses an industrial-scale air-water heat pump- and water circulation-based system …

  • "In the light of these results, we can recommend it to other utilities. Especially if your utility has never calculated the return on investment for switching devices before. And then, if it is a challenge to include automation projects in construction programs, it makes it easier when you can show …

  • “We now have a consistent process for every change order that gives everyone the ability to look at all change orders to make sure we’re moving forward, and be predictive for the future.”