999 Trimble Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “We had a really good reputation for grade work on projects of all types, but I felt we needed to upgrade our capabilities to better compete in the business both in terms of talent and types of projects. I wanted the right skilled team so that we could grow at …

  • “I believe we were able to significantly cut down on errors by using 3D modeling and certainly improved the quality of building compared to the alternative of designing in a traditional 2D environment. Even though there were truly difficult structures and complex details, I never heard of a single problem …

  • "The Trimble support team are extremely responsive, eager to help and very personable. They’ve always been very friendly and quick to respond to my needs. When you’re done, it feels like you know them and they’re more like a friend helping you figure out an issue. That support makes a …

  • “Conventional staking and grading would have taken at least 30% longer. With steep slopes on the reservoir project, our operators ran the mass excavators and scrapers consistently within a foot or less of grade and we eliminated the surveyor entirely, so it keeps the job flowing smoother. We were then …

  • “By working with the best technology and staying focused on productivity, we can accomplish high quality work and have a safety as a top priority.”

  • “It would have been very difficult to tackle this project without the Trimble technology. With all the transitions, a surveyor would constantly have to keep us on grade, and then inevitably stakes get taken out. With machine control, we didn’t use stakes and we got to the correct grade fast. …

  • “We were able to achieve an average standard deviation of 4 millimeters across the entire 92,000 square meters on the surface lift. We were very satisfied with this performance over such a large area.”

  • “The real advantage with Quantm is the ability to be able to look at all those routes at the same time and have all the factors included. It gives us a lot more confidence when we're speaking to the public because we have analyzed those factors and locations. We can …

  • “To eliminate a cold joint in the middle, we ran two pavers in echelon equipped with Trimble 3D paving systems, each following a material transfer vehicle for nonstop paving. With that system and Trimble technology on our pavers, we were able to get the ultimate and smoothest track surface possible.”

  • “You can spend the night lifting pits before you find the one you are looking for. With RFID, crews get to the right location the first time. You can very quickly find exactly what you’re looking for.”

  • “While the equipment was being shipped, a scan of the runway was run, which took one night - as opposed to the six months the conventional survey took - and it showed some big problems with the design and tie-ins on the side joint, which could now be fixed before …

  • “With Trimble 3D milling we can save our customers a significant amount of money. We’re showing project owners that by using 3D milling technology we can mill with better accuracy and less rework― all at a reduced cost.”

  • “We have used the Trimble GPS system for projects ranging from grading large building pads to retention ponds and complex pavement designs. It has reduced our time for excavation time across a range of projects by 25%, which means a lot to our bottom line.”

  • "We wanted to keep using our existing equipment, so we discussed it with our contacts at SITECH, Nederland, the supplier of our Trimble 3D GPS systems, at the TKD tradeshow in 2014. They recommended Trimble’s total station technology. Starting in July 2014, we worked non-stop with two excavators controlled by …

  • “We opted for Trimble equipment because it is especially well suited to large construction projects such as BPL or the A719. It is precise and of very high quality. This investment was also driven by the quality of SITECH's service: their service-after-sales is very responsive."