264 Solid Edge Case Studies

Industry
Company Size
15 per page
  • 15
Reset
  • UWC Holdings cuts product development time by 50% with Solid Edge

  • EIGSA reduces engineering development time by 60% with Solid Edge

  • Hung Chun Bio-S cuts bone plate processing from 6 hours to 2 with Solid Edge

  • Parfaite cuts simulation verification time by 83% with Solid Edge

  • MJC Engineering & Technology designs a 55-ton, 80-foot CNC metal spinning machine with Solid Edge

  • Lid Jarnindustri uses Solid Edge to manage 80,000 files and speed product design

  • Savio Macchine Tessili cuts product development time with Solid Edge, standardizing 95% of machine parts

  • Savio Macchine Tessili SpA slashes lead time with Solid Edge as 95% of parts become standard

  • Los Pinos cuts development cycle time by 50% with Solid Edge

  • LOS PINOS shrinks development cycle time by 50% with Solid Edge

  • Hymer reduces physical prototypes by 80% with Solid Edge

  • Sysmetric cuts design time from 3-4 weeks to 2-3 days with Solid Edge

  • PharmaPack cuts R&D design cycle by 17% with Solid Edge

  • Mecmesin cuts prototyping and boosts design efficiency with Solid Edge, saving up to 300%

  • Mecmesin cuts product design weight and saves up to 300% with Solid Edge