SLB Case Studies

  • Proteus System Simplifies Flow Control for Five-Zone Multilateral Well in the Middle East

  • First 30-in Casing Drilling Run with Direct XCD Bit Saves 1.31 Days in a Shallow-Water Exploration Well

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked