SLB Case Studies

  • Operator Uses HiWAY Technique to Increase Production 36% with Less Water and Proppant

  • LIVE Act Services Enable Successful Retrieval of More Than 3,000 ft of E-Line Cable in Two Wells

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked