1,277 Siemens PLM Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “The heart of any successful project is the reliability of up-front schedule and cost estimates. Anything that increases uncertainty and limits flexibility hurts both the project and the business performance of associated organizations. DAA made significant strides in reducing uncertainty and increasing flexibility using Simcenter.”

  • “We have already produced thousands of valuable design files. To leverage that data and increase our productivity, we began searching for a product data management (PDM) system. In a CAD system where part and assembly design files are intricately associative with each other, PDM is mandatory. We are starting to …

  • “Overall NX has reduced the cycle time for new product development by 30 percent and we expect to eventually reach a 50-percent reduction.”

  • "I am impressed with the flexibility of the Teamcenter PLM solution and the dedication of the TCS (Tata Consultancy Services) – Siemens’ implementation team, adapting to the Crompton Greaves requirements and approach, meeting the delivery commitments."

  • "I am impressed with the flexibility of the Teamcenter PLM solution and the dedication of the TCS (Tata Consultancy Services) – Siemens’ implementation team, adapting to the Crompton Greaves requirements and approach, meeting the delivery commitments."

  • "We chose Solid Edge not only because the product is proven, but also because it is widely deployed in the automotive industry, both across our customer and supplier sites."

  • "Using Teamcenter, we have implemented an efficient management of revisions and design history, recovering 100 percent of existing designs with no pain."

  • "The adoption of NX was a turning point for us, after we had worked for several years with I-deas, accumulating approximately 45,000 parts in 3D. NX offered the opportunity of a big technology leap, but our heritage could not be wasted."

  • "Using Tecnomatix, we achieved an exceptionally accurate realization of the continuous flow production, one-piece flow concept and optimized material link. The direct result of that achievement was a significant reduction in cycle time, work-in-progress and stocks. We realized the objective of our lean management approach – avoiding as much waste …

  • “The possibilities of the digital manufacturing environment turned the balance for an important bid. They convinced the customer that we are just the right partner.”

  • “Using Solid Edge with synchronous technology has not only strengthened our design and documentation process, it has allowed us to essentially cut design time in half, including on the electromagnetic undulator for the European X-Ray Laser Project XFEL.”

  • "When we first started using STAR-CCM+, we did not have much lab test data to correlate with the CFD results, so we did not know the best model settings – such as roughness or leakage flows – to use. We now have a library of lab test data that validates …

  • “We are relying on our strategic use of CFD simulation to help us beat our competition to market with better performing pumps, and increase market share.”

  • "The more I got to use Solid Edge the more I felt like I don’t need to be worried about it slowing me down. I realized it was actually going to speed me up. So I’m not worried about losing my top-gun status as a SOLIDWORKS user because I feel …

  • “Using synchronous technology will allow us to make faster and more frequent design iterations.”