1277 Siemens PLM Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “Solid Edge has enabled the company to reduce design cycle time by 30 percent. Just as importantly, the company has dramatically improved product quality as design errors and part rework/rejections have been slashed by almost 70 percent.”

  • "We have a lot of different satellite areas that work on different pieces of the business. NX is really the foundation that ties all of these different areas across the globe into one synergistic operation for us."

  • “When you’re changing certain designs in such a short period of time, obviously there must be a level of confidence, and that comes from the Siemens software.”

  • "Having an integrated CAD-tosimulation environment greatly enhances the efficiency of design iterations."

  • "I am extremely happy with the results of our move to Solid Edge, as well as with the personalized training and support."

  • "We incurred no additional costs for testing equipment, and the noticeable improvement of the design group was certainly recognized."

  • "Using Siemens PLM Software products, ISTU has achieved great accomplishments in the areas of student education and scientific research."

  • "The 10-year partnership with LMS Engineering significantly strengthened our position with automotive OEMs. We are now recognized as a valuable technology partner and work together on improving fuel consumption while ensuring comfortable driving."

  • “Compared to the past when we performed physical testing, we have been able to reduce the product development cycle and create optimized designs.”

  • “While it’s invisible to the designers, Insight technology performs all of the critical functions our engineering organization needs to ensure the integrity and efficient access of our Solid Edge data.”

  • “We have already produced thousands of valuable design files. To leverage that data and increase our productivity, we began searching for a product data management (PDM) system. In a CAD system where part and assembly design files are intricately associative with each other, PDM is mandatory. We are starting to see CAD efficiencies level off due to the sheer volume of data.”

  • “We are only beginning to use NX, but we already see a highly productive tool that will fit our requirements in regard to quality and transparency as well as adherence to costs and delivery dates.”

  • “If we didn’t have LMS Virtual.Lab and LMS Imagine.Lab during the design phase, we wouldn’t have discovered an inadvertent opening in the RAT in flight. They helped us to find such problems, and to discover some physics problems during the deployment that we absolutely didn’t expect.”

  • “With Process Simulate Virtual Commissioning, we can get the robotics workcells 98 percent ready before ever going to the shop floor.”

  • “Process Simulate Virtual Commissioning also enables a higher level of cycle-time productivity, as the robotics cell interlocks are optimized. This means producing more units with the same equipment or, as the experts in the automotive companies say, ‘higher jobs per hour (JPH),’ which is a huge benefit for our customers.”