1277 Siemens PLM Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “By using LMS Amesim for the hydraulic system design, we estimate that we have reduced optimization time by a factor of 3, and prototype costs by a factor of 4.”

  • “What really attracts us is the independent core technology embedded in Solid Edge, which enables us to keep up with technology investments and guarantee investment returns for users.”

  • "I am extremely happy with the results of our move to Solid Edge, as well as with the personalized training and support."

  • “The design documents of club heads from our Taoyuan R&D center are now transmitted directly to the CNC platforms of our factories in Guandong and other sites for die sinking, molding and later for immediate processing. It used to take an average of 21 days to mold, but that has been measurably reduced to just seven days.”

  • “While we have achieved a 67 percent reduction in mold production time, we plan to further leverage the technology tools of Siemens PLM Software and the technical insight of Alpha.”

  • “Fu Sheng uses the project management capabilities of Teamcenter to control its orders. Teamcenter produces tracking statistics that enable the leaders of each project to keep the progress of their work in perspective.”

  • “Using the 3D capabilities of Solid Edge allowed us to reach this level of approval without drawing a single plane and with a significant reduction in design times.”

  • "Power plants represent multifaceted assemblies of systems and components built on-site by an extended team of construction workers and engineers. We work with a large number of vendors, who are required to deliver their project segments at the right time so that the overall project stays on schedule."

  • "On a recent thermal project, we managed multiple workflows – as many as 800 or more at a time – and cut reference drawing review time from 21 days to 7."

  • "What we also strongly valued about Siemens PLM Software during the benchmarking process of LMS Virtual.Lab Durability was the responsiveness to adapt the tool completely to the existing development process."

  • "With FactoryCAD, communication was improved, the layout was created in 3D significantly faster than traditional 2D methods and layout issues were discovered virtually versus during plant startup."

  • "Teamcenter was selected because it offered the most ready-to-use functionality."

  • "The modeling process to create the data for manufacturing is quite complex. With its linked CAD and CAM, NX is extremely effective at solving this challenge.”

  • “The postprocessor used to be a black box, but with the NX Post Builder we can now create and adjust it by ourselves.”

  • “Solid Edge is extremely fast, and has an intuitive menu navigation that allows great freedom for creating new files and making modifications to parts as well as assembly environments.”