Beam AI References Capped?

Access even more references from these marketplace competitors

  • 4.8 / 5.0 (789)
    21+ References
  • 4.8 / 5.0 (3821)
    Verified 300+ References
  • 4.8 / 5.0 (180)
    17+ References

Beam AI Case Studies

  • Pilkington Construction Co. Witnesses 1.5X Business Growth with Beam AI Takeoffs

  • Blach Construction Reduced Takeoff Time from 5 to 1 day and Improved Budget Turnaround with Beam AI

  • currently locked
  • Togal.AI
    Reference Rating
    4.8 / 5.0
    Customer References 21 total
    About

    Togal.AI solves the most time-consuming part in the bidding process by utilizing cutting-edge deep machine learning technology to analyze blueprints. Eliminate the most tedious parts of the takeoff process by …

  • STACK Construction Technologies
    Reference Rating
    4.8 / 5.0
    Customer References 300 total
    About

    From project evaluation to completion, contractors use STACK’s cloud-based software to help run their business and maximize their profits. Our preconstruction solutions enable fast and accurate bid management and takeoff …

  • Bobyard
    Reference Rating
    4.8 / 5.0
    Customer References 17 total
    About

    Bobyard is changing this by using computer vision and language models to automate takeoffs and estimating, making cost estimates up to 10× faster while eliminating costly mistakes. By turning hours …

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked