21 Guidewheel Case Studies

Industry
Company Size
15 per page
  • 15
Reset
  • Weatherables boosts OEE by 12% with Guidewheel

  • Thermopak Limited expands to 71 machines with Guidewheel

  • Pack Labs reduces downtime by 40% with Guidewheel

  • Graphyte monitors 11 machines with Guidewheel to scale carbon removal

  • Seacast gets 30 machines live in under one month with Guidewheel

  • Penn Color increases asset utilization by 30–35% with Guidewheel

  • Penn Color increases equipment utilization by 30-35% with Guidewheel

  • Reducing idle time 30-60% and improving OEE by 41%

  • Optimizing setups and changeovers

  • Packaging Industry Production Manager’s Team cuts downtime 50% with Guidewheel

  • Cantex improves efficiency and CapEx decisions with Guidewheel’s up-to-the-second data

  • Fibrix Filtration achieves 92% uptime with Guidewheel

  • Custom Engineered Wheels expands to 41 presses with Guidewheel

  • Pretium Packaging lowers energy costs across 26 facilities with Guidewheel in under 3 minutes

  • RAPAC catches quality issues more than a week earlier with Guidewheel