  • "If it wasn’t for Archicad, maybe we wouldn’t have completed the project in time. Most likely with 2DCAD, walkthroughs or renderings would have been too late for client approval. Also, the client would not have understood our design proposal so well from the initial design stage."

  • "Archicad is more convenient to use and more adaptive to the way architects think. BIM technology is sufficiently mature. The software is light and easy to operate. These features play a key role in the whole design process."

  • "BIM is a tool that we use to communicate with stakeholders, with the builders, with everybody connected to the project. It’s a leadership tool that enables us to deliver the project."

  • "Archicad has been found to be quite flexible in order to divide information into smaller pieces and still keep most of the information in just a few model files. IFC files are created from these main model files."

  • "You start with a more precise foundation and you can jump from drawing details back to overall design approaches and vice versa. Here, ARCHICAD is a unique tool compared to other BIM programs."

  • "The building is shaped like a butterfly with the large planted roof rising out of the nature park. The roof aims to grow the local flower of the region,"

  • "In the past 5 years we’ve perfected a workflow that lets us design tens of thousands of square meter buildings, without any considerable challenge."

  • "Open BIM helped us to efficiently understand each other’s workflow and to quickly set up the collaboration. As a preparation for the BSL event, HDR|Rice Daubney and Obayashi Corporation had web meetings to make sure we understand the workflow for this specific project, including what software we use and how we share the models. This preparation did not take too much time because it was the Open BIM workflow and because both companies had enough experience."

  • "The idea of designing a project in plan, then modeling it for communicating the project seemed completely absurd especially with the additional requirement of making a specific model for thermal simulation."