ElectrifAi Case Studies

  • Speeding up building inspections by 60x and 80% time savings

  • Enhanced company-wide spend visibility, 25% supplier compression, and 99.5% spend classification

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked