EDRMedeso Testimonials

  • "With a price tag for one offshore lifting operations of 20 million NOK per day, when the crane vessel is doing lifting operation, and with total costs easily exceeding 100 million NOK for a lifting operation, factoring in transit and weather delays, the expenses are significant."

  • “For nearly 25 years, we’ve relied on engineering simulation via Ansys to optimize the performance of our yachts both above and below the water. Today we’re running more and more simulations, and computationally larger simulations, as we look at the yacht as an integrated system and perfect the smallest design …

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked