152 dormakaba Case Studies

Industry
Company Size
15 per page
  • 15
Reset
  • Tirol Kliniken secures 15,000 locking cylinders and 11,000 ID cards with dormakaba

  • Emirates Arena reduces energy loss with dormakaba’s 3,000-seat velodrome solution

  • StabiKat - Customer Case Study

  • Regent Palace Hotel enhances Grade II listed redevelopment with dormakaba's ITS 96 and TS 92 solutions

  • University College Dublin adds 134 bed spaces with dormakaba

  • The Lakes by Yoo elevates lakeside homes with dormakaba ITS 96 on a 650-acre Cotswolds site

  • Margarete-Steiff-School improves barrier-free access with dormakaba’s 2.65-metre sliding doors

  • Dubai International Airport retrofits doors for 75 million passengers with dormakaba

  • Allerton High School reduces wind load issues with dormakaba ED250A, compensating for up to 150 N

  • Emirates Palace enhances conference flexibility with dormakaba’s 67 dB Variflex Top 100 system

  • The Shard reaches 309 metres with dormakaba

  • ACME delivers a £165 million retail landmark with dormakaba

  • Alton Towers Resort equips 76 hotel doors with dormakaba’s discreet ITS96 solution

  • Adidas upgrades its 1,800 m² flagship store with dormakaba

  • Olympic Park, London equips 2,500 door closers with dormakaba