152 dormakaba Case Studies

Industry
Company Size
15 per page
  • 15
Reset
  • Tirol Kliniken secures 15,000 locking cylinders and 11,000 ID cards with dormakaba

  • The Peppermill Hotel Casino expands with a $400 million upgrade using dormakaba

  • Greenville Technical College secures 110,000 sq ft campus with dormakaba

  • Maison Relais, Born equips 400 kg entrance doors with dormakaba

  • The Landmark London upgrades 120-year-old access control with dormakaba

  • ME Hotel opens 157-room London flagship with dormakaba

  • Bideford College achieves BREEAM ‘Excellent’ with dormakaba at £55 million new-build

  • Holy Trinity Parish Church creates 3 flexible rooms with dormakaba

  • Radisson SAS Hotel streamlines 1,000 m² conference space with dormakaba

  • Hitachi Rail Europe equips Class 800/801 trains with dormakaba high-security locking

  • Great Western Railway improves passenger safety with dormakaba's 100-million-code Kaba 20 key system

  • Blackburn Rovers FC reduces maintenance costs and improves security with dormakaba DORVISION

  • Gaylord National Resort & Convention Center enhances energy efficiency since 2010 with dormakaba

  • George House revitalizes its entrance and reduces energy loss with dormakaba

  • Embassy Gardens installs 108 FSW-G glass wall systems with dormakaba