597 Dassault Systemes Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • "One of the major advantages of using Abaqus Unified is its ability to provide comprehensive linear and nonlinear dynamic analyses of building structures, taking into account the interaction of structures with the foundation, which invariably contributes to improving the overall safety of a plant."

  • "The use of Dassault Systèmes PLM has greatly aided the ULTra project by providing a flexible, technically and economically viable tool to deliver advanced transport solutions.”

  • “Due to its unique performance characteristics, FFRP has the potential to enable new development scenarios in deep and ultra-deepwater fields around the globe."

  • "Since we have started working with MineSched, our team training and mine planning at Meadowbank has improved significantly."

  • “3DEXPERIENCE will help us visualize the status of a project at all times and will provide us with more complete and faster access to all our information.”

  • "Simulating a blast event provides important, realistic data without the risk of involving test subjects."

  • "The FEA model is an effective tool to plan and critique each series of experiments."

  • "With 3DVIA Composer’s 3D animation features all workers have the same level of understanding, which reduces construction time while improving safety."

  • "With [Dassault Systèmes'] BIOVIA Discoverant I can see things I didn’t even dream of before."

  • “It is estimated it would have taken approximately 70 days to complete all 35 runs, while maintaining other day-to-day work; we completed this task in about four days.”

  • "Typically, the manual CAE process consumes two days just to complete one run. Of course, this timing can be reduced if the project is critical, but this is the typical day-to-day turnaround time balancing several projects per engineer."

  • "What made the difference for the Ford management team was the capability of CATIA to integrate CAE tools. They recognized that the resulting efficiency improvements would be significant."

  • "With integrated CAD/CAE templates as part of our Digital Vehicle Engineering strategy, we are able to accelerate the initial geometry and analysis generation process. This allows CAE to drive design upfront, rather than validating later in the design process."

  • "For the cylinder head deck lift analysis it used to take an analyst one to two days to set up the model. But with the template and a CAE-ready model, setup time has been reduced to less than 30 minutes.”

  • “By eliminating the CAD-to-CAE-to-CAD handoffs, we have saved three to four weeks overall in product development cycle time."