597 Dassault Systemes Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “SQL Server 2005 is the backbone of all Piaggio Aero Industries’ data management and ENOVIA is the backbone of our product and manufacturing data.”

  • "Supplier-created content represents 50-60 percent of the value of an aerospace system."

  • “Every engineer has something they do very well. The key is to use DS PLM to capture that and replicate it across the entire organization.”

  • “We are riding a wave of innovation that has become possible because of tools like SolidWorks.”

  • “With CATIA PLM Express, we can handle a project from A to Z in half the time it would have taken before.”

  • “Using simulation to predict that weight and stiffness ahead of time reduced the number of make-andbreak cycles necessary to get where we needed to be.”

  • "Jay realized the need to capture true loading of his bike frames in order to drive realistic simulation that matched the real world. True-Load was a tool that could provide a clean, complete solution to meet those needs."

  • “Virtual simulation with DELMIA enabled us to prove our build concept, verify the assembly path of the parts in the factory, and more efficiently balance the workload between stations, thereby reducing overall lead times.”

  • "In EU projects, it is important to demonstrate the potential of the developed technologies and how they can be implemented in products and production. In LOCOMACHS, we chose to implement the most promising technologies in the virtual wing factory of the future to show the possibilities and efficiency of these …

  • “Being able to see a digital model of a ship before production begins is an unforgettable experience for our customers.”

  • “The 3DEXPERIENCE platform, hence, has allowed us to offer more custom solutions at a much more affordable price.”

  • “Historically, we’ve used CATIA because it’s the strongest 3D engine able to handle these complex designs, but now there’s all this other information that we’re able to access through ENOVIA.”

  • “What makes the U.S. Olympic Museum unique is its purpose. Each Olympic athlete is unique. The architect, general contractor and MG McGrath want this building to stand out as much as each one of those one-of-a-kind athletes. You’ll see these beautiful triangulated surfaces and diamonds on the surface with a …

  • “It is estimated it would have taken approximately 70 days to complete all 35 runs, while maintaining other day-to-day work; we completed this task in about four days.”

  • "Typically, the manual CAE process consumes two days just to complete one run. Of course, this timing can be reduced if the project is critical, but this is the typical day-to-day turnaround time balancing several projects per engineer."