Danfoss Testimonials

  • "The return on investment for this retrofit is convincingly fast. Since two arrays are typically operating 24/7, the payback for retrofitting a second array will also be about 18 months. This second retrofit is planned for the near future."

  • “We’ve installed a lot of Danfoss components for our customers over the years. so it was natural for us to choose a Danfoss PAH back in 2014. Zerocontamination risk was important, of course, but just as critical was the pump’s exceptional reliability. Sawmills depend on exact moisture management in their drying kilns, and a single pump failure can cost them tens of thousands of euros.”

  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked
  • currently locked