“When you reduce the redundant work, you’re giving people more time to do what they really like doing.”
-
“BIM and IDD help integrate our entire process together because it isn’t as simple as getting a room done in the factory and then swinging it in. Before that can be done, we need all the stakeholders to come together and make sure that everything is well coordinated.”
-
“They responded even better than we expected. We get a lot of emails from divers who tell us that they connected with our film. We’re so happy that the film is making people aware of ocean pollution.”
-
“Recently we had about 30 site issues on an entire project. That’s a huge reduction in the amount of work we have to do to fix problems and it’s a big advantage of using this software.”
-
“In addition to the environmental goals, we are also emphasizing the ‘social sustainability’ aspect by reimagining the traditional office ground floor as an inviting food court and making amenities like the auditorium accessible to the public, further integrating into the neighborhood.”
-
“Marmormolen is a prime example of how we have optimized our design capabilities by applying the latest technologies to solve sustainability challenges and setting new standards for sustainability in design. By applying the full potential of current technologies, we can seamlessly connect across the architecture, design, and engineering processes at …
-
“Performing lifecycle assessments continuously throughout the Marmormolen project forced us to reconsider some of the design choices and whether a material here or there was actually needed."
-
“We came in and began doing studies on the façade to create a unique building that was contextual in the neighborhood, but also tapped into the beauty of the former building."
-
"We're one of very few contractors out there that actually models all their content down to even half-inch conduit, which is unique when it comes to industry standards."
-
"Ironically, electrical engineering was my least favorite subject in college."
-
“More than ever, our goal is to drive the energy and heating revolution forward."
-
“They can understand the procedures, design a sequence of work, and decide on the workflow.”
-
“In factory projects, meeting production requirements is essential, and production line equipment plays a crucial role in this regard. Therefore, it is necessary to integrate the BIM of production lines with that of buildings, which is referred to as Autodesk’s Integrated Factory Model. Also, the BIM model of a factory …
-
“We supported its use and the opportunity to collaborate with SJB and external partners, as we had already experienced the benefits. The approval came from the BIM and project teams, with the final sign-off from management. The biggest metric we provided to justify the spend was the return on investment …
-
“There was multifaceted planning required for the voco-HIE hotel, which is not typical for stacked hotels. This was a unique project. As you progress up the building, you’re effectively dealing with two different designs – one for voco, and one for HIE."