287 Autodesk Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “It was really cool to watch all the engineers gathered around the computer screen, watching generative design create an optimized, strong part out of almost nothing, just the constraints. All the iterations that are needed to come to the best solution are done by the software.”

  • “Then, they can repurpose materials into more permanent situations like patient rooms, ICUs, isolation rooms, and clinical exam rooms.”

  • “We needed to reimagine the design and preconstruction phase by using a common data environment to create a shared view of all activities, dependencies, deadlines, and inquiries, this would eliminate data silos, streamline review cycles, and extract real-time data for design coordination and review, quantity-take-off, and mark-ups.”

  • “Almost all the film is underwater, and it changes everything. We had to adapt the animation, the lighting, the way we were doing the FX and the compositing. It’s almost as if we had to learn everything again.”

  • “They responded even better than we expected. We get a lot of emails from divers who tell us that they connected with our film. We’re so happy that the film is making people aware of ocean pollution.”

  • “There have been a lot of interpretations of classic bikes in the market lately. But Husqvarna was always pioneering, and we wanted to be forward-thinking, not just harkening back to the past. Where others have tried to do retro design on their bikes, we wanted to be cutting edge, superminimalistic, …

  • "Using Revit and other Autodesk BIM solutions for our design, we are delivering a higher quality design and enhancing our firm’s communication with our client, which will ultimately reduce their construction rework costs."

  • “Using Revit, design was a lot faster because all the stakeholders could see everything in the model at once. It was also a matter of information. For example, we stored information about the actual concrete strength of every element in the BIM model. Once they saw the information we could …

  • “It’s hard to do good work when it’s freezing outside. It’s hard for the person staying outside a long time to set up the drone and do it accurately.”

  • “Some people associate BIM and Revit with large projects, but projects of every size can experience the improved coordination and better communication that intelligent models help enable.”

  • “It took approximately six weeks to model the hospital. And without reality capture and ReCap, the total project would have taken months longer.”

  • “When you lack confidence in coordination, prefab doesn’t make sense because there’s too much risk of expensive on-site rework. But prefab can offer huge cost, time, and material savings. Our design team modeled with such precision that we decided that the advantages outweighed the risks.”

  • "Tercero Dining Commons is about 29,000 square feet, and half of that space is occupied by kitchen equipment. Being able to have a back and forth with a kitchen designer who was using Revit helped improve the project overall. We were able to balance space constraints as a team very …

  • “We will figure out more parts on which to apply optimizations and material reductions in the future. Part by part, we’ll try to see if generative design will have the same positive benefits.”

  • “There’s always something to learn with AutoCAD. I’ve been doing it for five years, but I still learn something new all the time.”