"Using Revit and other Autodesk BIM solutions for our design, we are delivering a higher quality design and enhancing our firm’s communication with our client, which will ultimately reduce their construction rework costs."
“As the general contractor of China Zun Tower, we focus on technical innovation. We have applied more than 20 new technologies on this project, among which BIM provides us evolutional experience. We work deeply with designers and subcontractors based on BIM models. With BIM's advantage of information integration, we significantly increase efficiency and construction quality. And it also improves the team's capability to handle a super-complicated project like this.”
“A Smart Exhibition encompasses how we can leverage digital twin and sensor data through the entire design, and archival / virtual reality aspects of our exhibitions. There are perpetual opportunities for visualization with decision makers, artists, funders, etc. And opportunities to leverage data inputs and outputs for our exhibits."
“They responded even better than we expected. We get a lot of emails from divers who tell us that they connected with our film. We’re so happy that the film is making people aware of ocean pollution.”
“There have been a lot of interpretations of classic bikes in the market lately. But Husqvarna was always pioneering, and we wanted to be forward-thinking, not just harkening back to the past. Where others have tried to do retro design on their bikes, we wanted to be cutting edge, superminimalistic, and really progressive in our approach but still have this simplicity that the products back then had.”
“Using Revit, design was a lot faster because all the stakeholders could see everything in the model at once. It was also a matter of information. For example, we stored information about the actual concrete strength of every element in the BIM model. Once they saw the information we could put inside the software, they started to understand the advantages of using it.”
“It’s hard to do good work when it’s freezing outside. It’s hard for the person staying outside a long time to set up the drone and do it accurately.”
“Some people associate BIM and Revit with large projects, but projects of every size can experience the improved coordination and better communication that intelligent models help enable.”
“It took approximately six weeks to model the hospital. And without reality capture and ReCap, the total project would have taken months longer.”
“When you lack confidence in coordination, prefab doesn’t make sense because there’s too much risk of expensive on-site rework. But prefab can offer huge cost, time, and material savings. Our design team modeled with such precision that we decided that the advantages outweighed the risks.”
"Tercero Dining Commons is about 29,000 square feet, and half of that space is occupied by kitchen equipment. Being able to have a back and forth with a kitchen designer who was using Revit helped improve the project overall. We were able to balance space constraints as a team very early."
“We will figure out more parts on which to apply optimizations and material reductions in the future. Part by part, we’ll try to see if generative design will have the same positive benefits.”
“It was really cool to watch all the engineers gathered around the computer screen, watching generative design create an optimized, strong part out of almost nothing, just the constraints. All the iterations that are needed to come to the best solution are done by the software.”
“There’s always something to learn with AutoCAD. I’ve been doing it for five years, but I still learn something new all the time.”
“By using our measuring recordings and testing gauges, our customers are able to measure the condition and quality of future products while still in the development phase.”