"When contractors removed the ceiling tiles, they wanted to replace all of the ductwork. It was in such bad shape, but it was simply not in the budget. Aeroseal duct sealing proved to be much less expensive than replacing the ductwork and it took only a matter of days to complete the job, keeping us on schedule."
"The results spoke for themselves. The aerosol duct sealing (method) was able to do what several attempts at manual sealing with mastic/tape could not – and it did it without the demolition or disruption that traditional sealing requires. Our goal was to get the air handling units operating at optimal efficiency, which it allowed us to do. The energy savings was certainly welcomed. We estimate ROI to be less than one year."












