592 3D Systems Testimonials

Industry
Company Size
15 per page
  • 15
Reset
  • “Every feature is more or less conventional, but putting them together in a single compact and competitive mechanism is really a challenge.”

  • “Customers love this service They would typically have to wait two to three weeks to get just tooling, never mind test parts. With the ProJet MJP we made one customer four different part designs over the course of six days, shipping them 10-12 parts for each iteration overnight."

  • "The market success and Schweppes’ confidence in the design can be directly attributed to the meaningful research that was conducted, and which was made possible by the high quality prototypes by 3D Systems.”

  • “FLS has been instrumental in single-handedly revolutionizing surgical training worldwide, and requiring FES as a part of the ABS Flexible Endoscopy Curriculum is step two of this collaborative effort to elevate the standards and training for MIS.”

  • “As we continue to prove our hypotheses correct, we are generating an understanding of the increasingly complicated motion of the carpal bones. Three-dimensional animations have been the only way for us to visualize these findings.”

  • "We do all kinds of 3D printing work -- concept modeling, verification, prototyping -- but direct digital manufacturing of end-use parts is the biggest opportunity."

  • "We needed a 3D printing partner that was known for quality, reliability and expertise in the medical device space. 3D Systems has been an amazing partner at every level—they are supportive, responsive and dedicated to excellence."

  • “It’s amazing. I’m doing five-axis machining, but my scheduled five-axis training is two weeks away.”

  • “In our surface analyses, we aim to identify deviations from the target state in a fully-assembled section. Once everything has been captured with the laser scanner, we edit and analyze the point cloud with Geomagic Control X. The software makes the entire process much easier for us as it can …

  • “We have to be able to rely on our measurement results at all times. With 3D Systems, we have a reliable partner by our side who understands our needs and is constantly improving the inspection software. This enables us at MEYER WERFT to build amazing cruise ships, ferries, and research …

  • "We use CimatronE’s 5-Axis every day without fail. From converting incoming files, to building contact surfaces, the system is crucial to our operations. I honestly don’t know how we could manage without it."

  • "Error-free production has become the reality at Gira thanks to CimatronE’s automated electrode solution."

  • “Our obstacle is getting customers familiar with the process we use for the first-article inspection, By creating an industry standard for non-contact parts verification, valuable time savings will improve the flow of the supply chain and relieve pressure on our customers as they move to just-in-time inventory and other cost-saving …

  • “3D Systems software was a crucial tool from beginning to end. We found the problem, fixed it and documented the changes. I don’t know how we ever did without it.”

  • “Benchmark testing demonstrated that the more even cooling provided by the conformal lines made it possible to reduce the cycle time and increase productivity throughput by 30%. The life of the mold is also expected to be substantially higher since the cycle time reductions provided by conformal cooling make it …