“During commissioning periods, it’s quite difficult to optimize performance, as all of your turbines are in a different phase of their life.”
"The dedicated Power Factors project manager was always very clear about their engineering timelines so that we could align our own efforts on back end systems. It was a great opportunity to audit and true-up any differences between electrical drawings and what was really on the ground."